Advantech RS-485 Manuel d'utilisateur Page 300

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 348
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 299
A-10 ADAM-5000
Quick Start Example
Figure A-3 Grounding the INIT* terminal
3. Wait at least 7 seconds to let self-calibration and ranging takeef-
fect.
4. Configure the baud rate and/or checksum status.
5. Switch the power to the ADAM-5000 system OFF.
6. Remove the grounding on the INIT* terminal and power the
ADAM-5000 system ON.
7. Wait at least 7 seconds to let self-calibration and ranging takeef-
fect.
8. Check the settings. (If the baud rate has changed, the settings on
the host computer should be changed accordingly)
-
+
DATA-
DATA+
COM
INIT*
GND
+Vs
Vue de la page 299
1 2 ... 295 296 297 298 299 300 301 302 303 304 305 ... 347 348

Commentaires sur ces manuels

Pas de commentaire